
Tuesday, 1 June 2010
June 1st, 2010

May 31st, 2010

May 30th, 2010
Decided to go up to the vineyard to make a kerb at the entrance. I drove the tractor up to the vineyard and Steph picked me up so we could get the Landrover. I left the tractor by the gate on the hill.
Horror upon horror - when we returned 20mins later the hand break had slipped and the tractor had rolled down the hill into a tree. The front wheels were pointing in different directions and the Steering leaver is broken. Too stressed to take a picture. We managed to jack up the front of the tractor, straighten the wheels and Steph reversed it to the top of the hill. I had to steer the offside wheel by hand. I was absolutely devastated. My No1 Industrial accident fear involves handbreakes and gates, luckily no one was hurt and I am sure that the tractor can be fixed - its just gonna cost...
Funnily enough the same thing happened to George in exactly the same position a few years ago. Th tractor hit the same spot on the same tree - spooky!
www.chafor.co.uk
info@chafor.co.uk
May 29th, 2010
May 28th, 2010
www.chafor.co.uk
info@chafor.co.uk
May 27th, 2010

Welded the Cement mixer toplink back together. I hope it is strong enough. Spent 2-3 hours trying to attach the drum of the cement mixer to its frame. Should have done this as soon as I brought it home last year. Rust as ever is the problem. Eventually managed it, but would not like to disassemble it again. The new top link works - yet to fill with a heavy mix.
May 26th, 2010


May 25th, 2010

May 23rd, 2010
May 21st, 2010


Bent the toplink for the Cement mixer. It needs grinding and re welding.
Good job that I have been practicing my welding!
Did some mowing, first pass through the rows that I intend to manage by cutting the weeds on a regular basis.
Clive did a thorough service on the landrover and replaced a Universal Joint that had siezed up.
Hot again today.
http://www.chafor.co.uk/
info@chafor.co.uk
May 20th, 2010
Bent the suspension units on the trailer - they have been on their way out all winter.
http://www.chafor.co.uk/
info@chafor.co.uk
May 15th, 2010
Friday, 14 May 2010
May 11th, 2010


May 10th, 2010



The profile of the soil is
Top soil, Hoggin, Clay and Chalk, Hoggin, Pure Sand
May 7th, 2010





Sunday, 9 May 2010
May 5th, 2010


Eddy arrived with a big 13 tonne JCB 360. The plan is to spend 1/2 day digging out and then 1 day building the track. I spoke with Ardley quarry and have a lorry on return for about 100 tonnes of white limestone.
Before starting work on the track we decided to clean the ditch out that runs along side it. This also involved removing two trees that fell in years ago. One was an enormous willow. As you can see it was no mach for the JCB. The tree was literally ripped out the ground by the powerful arm.
Guess what - we are behind schedule. Stone starts arriving at 8am tomorrow and we have only dug out a small section though I am pleased as in the long run cleaning out the ditches will be beneficial to the drainage and I would not want to do it on a new track.
Went to pick Andrew up from Beavers. Finmere were playing Hinton in the Hedges in the evening league with 9 men. Rushed home to get my kit. got back in time to bat, went in no 10, faced 2 balls and 2 not out. Had 2 overs 2-7, game abandoned due to bad light.







